Joe Reilly (Work Log)

From edegan.com
Revision as of 09:54, 29 June 2017 by Jreilly (talk | contribs)
Jump to navigation Jump to search

Joe Reilly Work Logs (log page)

2017-06-20: Joined the center! Wrote my page. Started on Collecting SBIR Data. Finished collecting SBIR Data; saved in bulk(D:)--> McNair-->Projects-->SBIR. Began researching VC funds in the file Venture Funds in bulk(E:)-->McNair-->Projects-->Houston-->VCData

2017-06-21: Continued researching VC funds in the file Venture Funds in bulk(E:)-->McNair-->Projects-->Houston-->VCData.

2017-06-22: Finished researching VC funds in the file Venture Funds in bulk(E:)-->McNair-->Projects-->Houston-->VCData. Began grouping.

2017-06-23: Finished grouping VC funds in the file Venture Funds in bulk(E:)-->McNair-->Projects-->Houston-->VCData. Researched whether based in Houston, and whether they should be considered alive.

2017-06-27: Sorted VC funds in bulk(E:)-->McNair-->Projects-->Houston-->VCData; deleted non-operating ones; finalized groups. Began researching the relative size of different sectors in Houston's economy.

2017-06-28: Began adding cohorts to each new accelerator in bulk(E:)-->McNair-->Projects-->Accelerators-->Accelerator Match, saving each accelerator's cohort in bulk(E:)-->McNair-->Projects-->Accelerators-->Data-->(acceleratorname).cohort, either as an excel file or a text file.

2017-06-29: Continued adding cohorts to each new accelerator in bulk(E:)-->McNair-->Projects-->Accelerators-->Accelerator Match, saving each accelerator's cohort in bulk(E:)-->McNair-->Projects-->Accelerators-->Data-->(acceleratorname).cohort, either as an excel file or a text file.