There are 16 calendar days between now and March 7th (excluding the 7th). I am going to lose 2 to a course that I'm taking, and 1 to health-care. That leaves 13, which is one short of the 8+6 for the 2 extensions. I will probably also need one or two days off (I just can't keep working 7 day weeks), but nevertheless, it looks like I should be able to complete the basic rebuild in time, and perhaps (if things go well) add an extension or two.
 
==Rebuild Notes==
 
===Downloading the Acquisitions===
 
Basic Criteria:
*US Targets
*Announced: 1/1/1980 to 12/31/2011
*Target Nation: US
*Acquiror Nation: US
*Target Status: Private (V)
*Acquirer Status: Public (P)
*Percentage of Shares Owned after Transaction: 100 to 100 (will exclude those with missing data)
 
There is no longer a completed deal flag.
 
New Flags in SDC (downloaded for exclusions):
*Bankruptcy Flag
*Failed bank Flag
*Leveraged Buyout Flag
*Reverse LBO Flag
*Spinoff Flag
*Splitoff Flag
*Target is a Leveraged Buyout Firm