Difference between revisions of "Shelby Bice (Work Log)"

From edegan.com
Jump to navigation Jump to search
 
(37 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
===Fall 2017===
 +
<onlyinclude>
  
 +
[[Shelby Bice]] [[Work Logs]] [[Shelby Bice (Work Log)|(log page)]]
 +
 +
2017-12-08 1:00 pm - 2:45 pm - updated the ER Diagram on my project page to include the three tables for reissue, plant, and design patents respectively. Finished typing up the status of the project as I am leaving it with notes to Oliver and Ed
  
[[Shelby Bice]] [[Work Logs]] [[Shelby Bice (Work Log)|(log page)]]
+
2017-12-07 3:15 PM - 4:45 PM  (came in late due to finals) - finished debugging additions to Oliver's code for the tables that are related to design, reissue, and plant patents, added a troubleshooting section to Oliver's page with instructions on how to deal with issues importing the project.
  
===Spring 2017 Work===
+
2017-12-04 2:45 pm - 4:00 pm - continued debugging and started typing up troubleshooting tips for the next person who alters the patent code
2/14/2017 10:00 am - 12:00 pm Set up personal wiki, set up work log
 
  
2/16/2017 10:30 am - 12:00 pm Researched past work on databases, discussed project with Ed
+
2017-12-01 3:15 pm - 5:00 pm - ran code (and ran into errors) which I have been working on fixing. If I don't finish today, I'll continue doing so on Monday. I plan to write up some of the mistakes I made in adding the tables to the database and add them to Oliver's page, with his permission so that people in the future who are not familiar with the code (like I wasn't) hopefully won't fall into the same pitfalls. The main things are 1) how to set up a maven project (if IntelliJ doesn't automatically set it up for you when you open/import the project, and 2) how to set up the data source so you can run SQL scripts and actually load data into the database on the RDP.
  
2/21/2017 9:00 am - 12:00 pm Set up work page, reviewed SQL, researched designing database, continued going through wiki
+
2017-11-30-17 1:55 pm - 3:55 pm - continued altering code. Wrote creation tables script in SQL for creating tables for the design, reissue, and plant patents, and went through the checklist to make sure I had done everything to create these new tables based on Oliver's Reproducible Patent Data page. Will definitely run code tomorrow and will type up the exact process I went through to create new tables.
  
2/23/2017 9:30 am - 12:00 pm Reviewed Perl, read about database design, set up project page for redesigning database, started documenting process
+
2017-11-17 2:15 pm - 5:00 pm - continued altering code to include the special fields for plant, reissue, and design patent. Their models and the changes to XmlParser relevant to those models should be done. I will go through the rest of the code and check where else I need to make alterations next time I am in.
  
3/2/2017 9:15 am - 12:15 pm Started excel spreadsheet to document current schema design and improvements to be made, updated project pages
+
2017-11-16 8:45 am - 10:30 am - continued altering code to include the special fields for plant, reissue, and design patents
  
3/7/2017 9:30 am - 12:00 pm Continued working on spreadsheet, added relevant page links to project page, took notes on what I want documentation to look like in the future
+
2017-11-14 8:30 - 10:30 am - met with Oliver to go over his code, began working on scripts and finding paths for the fields qunie to design, reissue, and plant patents.
  
3/9/2017 9:00 am - 12:00 pm Finished first draft of spreadsheet describing the current schema (and possible changes) to the Patent database
+
2017-11-10: 2:00 - 5:00 pm - updated format of worklog, finished researching fields of the new design, utility, and reissue tables, and documenting what each table contains
  
3/21/2017 9:30 am - 12:00 pm - Worked on determining "core" tables for new patent database
+
2017-11-03: 2:30 - 3:30 pm, 3:45 pm - 5:00 pm (I went to get a snack because I was starving!) - Finished up finding unique fields, added them to database design, and researched what the fields represented - again, this is taking a while since there is little to no documentation online about what fields on these XML files actually represent.
  
3/22/2017 5:30 pm to 6:30 pm - Patent Data meeting
+
2017-11-02: 2:15 pm - 4:00 pm - made a main data page and continued going through the xpaths Oliver found. Notified Michelle so she can continue adding patent pages
  
3/23/2017 9:15 am - 12:00 pm - Narrowed down core tables and fields
+
2017-10-31: 9:00 am - 10:30 am - started trying to determine from Oliver's research what paths are unique to utility, reissue, and plant patents that we have not yet accounted for in our design of the table
  
4/4/2017 9:00 am - 11:45 pm - Worked on updating documentation, found documentation on pulling data/making tables and databases, started looking through DTDs to find extra fields to pull
+
2017-10-27: 2:00 pm - 3:30 pm - Kept updating tables. For some of the new values I've been adding to tables (I didn't realize we had XPaths for some fields) I'm struggling to find out exactly what the field means (for example, the date on a citation - is this the date the citedpatent was granted? or is the date that the citingpatent cited the citedpatent?) so the process is slow going. I want to get the documentation right though so in the future someone can look up and see exactly what each field in the table represents and not have to guess
  
4/6/2017 9:30 am - 11:30 pm - Kept looking through DTDs, kept updating documentation
+
2017-10-26: 2:00 pm - 4:00 pm - worked on updating the designs for the patent databases tables based on what was discussed on Friday (specifically adding inventors and lawyers tables, altering fields on patent tables) - will continue this on Friday
  
4/11/2017 9:15 am - 12:00 pm - Worked on trying to update patent data through 2016
+
2017-10-20: - 2:00 pm - 5:00 pm - met with Ed and Oliver about patent database design
  
4/13/2017 9:30 am - 12:00 pm - Continued working on trying to update patent data through 2016, specifically parsing the data, worked with Ed to update perl scripts
+
2017-10-19: 2:00 pm - 4:00 pm - finished up ER diagram and description of all tables for patent database, started reading papers concerning creating an inventor's database (looks like other research groups have merged the USPTO data with the Harvard Dataverse data in order to create an inventors table)
  
4/18/2017 9:45 am - 12:30 pm - Cleaned up documentation more, kept working through the process of parsing the data
+
2017-10-17: 8:45 am - 10:30 am - continued trying to solve twitter issues, worked on ER diagram, skimmed through a paper I found (linked at the top of the page for Redesign Assignment and Patent Database) to see how they cleaned the data, since I assume that will be the next step to research after finishing the ER diagrams
  
4/20/2017 10:00 am - 11:30 pm - wrote copy statements for copying data from RDP to database, continued working on documentation.
+
2017-10-12: 2:30 pm - 5:00 pm write blog post on Grace Hopper Celebration and attempted to solve Twitter issue
  
4/25/2017 10:00 am - 12:00 pm - worked on documentation, tried to determine how to clean up the USPTO Assignee Data
+
2017-10-03: 8:45 am - 10:30 am - finished adding descriptions to the fields for each table in the patent database, started work on an ER diagram
  
4/27/2017 1:00 pm - 3:00 pm - worked on documentation more, tried to figure out how to clean citation data
+
2017-09-29: 2:00 pm - 5:00 pm - finished adding the design for the Patent database to the project page, added descriptions of the fields for each table to the project page including the datatype that I think the field will be when it's loaded into the database
  
===Fall 2017 Work===
+
2017-09-28: 9:00 am - 10:30 am - continued going over and documenting last semester's patent database design and adding the details to the Redesign Assignment and Patent Database project page. Additionally, I began trying to determine how to match up the information in the Document_Info table in Assignment to match up with a patent_id in the Patent table in Patent.
9/15/2017  2:00 pm - 5:00 pm - introduced to new patent database projected, reviewed and took notes on USPTO Assignment data (notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper)
 
  
9/22/2017 8:30 am - 10:30 am - continued looking at paper on USPTO assignment data and adding to the notes on what the design of that database should look like, specifically on what I need for different tables and what I don't know yet about the design. Had to set up connection to RDP again due to technical issues.  
+
Tomorrow I will finish adding the design for the Patent database to the project page, add descriptions of the fields for each table to the project page, and start working on ER diagrams for the two databases.
  
9/23/2017 2:00 pm - 4:00 pm - continued working on design of Assignment database and how it will connect to Patent database by writing out what will be in each table in Assignment and questions about different possible structures of tables that we will have to address before finalizing the design - the notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper. Questions are highlighted in yellow throughout the document[[Category:Work Log]]
+
Links for creating ER diagrams: https://erdplus.com/#/standalone or https://creately.com/app/?tempID=hqdgwjki1&login_type=demo#
  
9/26/2017 8:45 am - 9:45 am - continued worked on design of Assignment database by checking my design against the work done last semester on the assignment data restructure to make sure I didn't miss anything major. Began going over my patent database design from last semester to tweak it. Will need to sync up with Joe Reilly to see if there are any new fields that we are pulling from the data.
+
2017-09-26: 8:45 am - 10:00 am - continued worked on design of Assignment database by checking my design against the work done last semester on the assignment data restructure to make sure I didn't miss anything major. Began going over my patent database design from last semester to tweak it. Will need to sync up with Joe Reilly to see if there are any new fields that we are pulling from the data. Additionally, I made a new project page called Redesign Assignment and Patent Database that encompasses the new design for the Assignment database and Patent database redesign and moved some of the notes from McNair/Projects/Redesigning Patent Database/New Patent Database Project/Notes on USPTO Assignment Data Paper to the project page.
  
 
The main takeaway from looking over Patent Assignment Data Restructure is that, after assembling the table according to my design (which doesn't seem to have any contradictions with the Patent Assignment Data Restructure) that there will by multiple steps for cleaning the data, specifically the fields relating to location and address in the assignment table. While the Patent Assignment Data Restructure mentions connecting to the Patent database, it is not clear from the page what field would be used to connect to the Patent database.
 
The main takeaway from looking over Patent Assignment Data Restructure is that, after assembling the table according to my design (which doesn't seem to have any contradictions with the Patent Assignment Data Restructure) that there will by multiple steps for cleaning the data, specifically the fields relating to location and address in the assignment table. While the Patent Assignment Data Restructure mentions connecting to the Patent database, it is not clear from the page what field would be used to connect to the Patent database.
 +
 +
2017-09-23: 2:00 pm - 4:00 pm - continued working on design of Assignment database and how it will connect to Patent database by writing out what will be in each table in Assignment and questions about different possible structures of tables that we will have to address before finalizing the design - the notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper. Questions are highlighted in yellow throughout the document[[Category:Work Log]]
 +
 +
2017-09-22: 8:30 am - 10:30 am - continued looking at paper on USPTO assignment data and adding to the notes on what the design of that database should look like, specifically on what I need for different tables and what I don't know yet about the design. Had to set up connection to RDP again due to technical issues.
 +
 +
2017-09-15: 2:00 pm - 5:00 pm - introduced to new patent database projected, reviewed and took notes on USPTO Assignment data (notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper)
 +
 +
</onlyinclude>
 +
 +
===Spring 2017===
 +
 +
2017-04-27:  1:00 pm - 3:00 pm - worked on documentation more, tried to figure out how to clean citation data
 +
 +
2017-04-25:  10:00 am - 12:00 pm - worked on documentation, tried to determine how to clean up the USPTO Assignee Data
 +
 +
2017-04-20:  10:00 am - 11:30 pm - wrote copy statements for copying data from RDP to database, continued working on documentation.
 +
 +
2017-04-18:  9:45 am - 12:30 pm - Cleaned up documentation more, kept working through the process of parsing the data
 +
 +
2017-04-13: 9:30 am - 12:00 pm - Continued working on trying to update patent data through 2016, specifically parsing the data, worked with Ed to update perl scripts
 +
 +
2017-04-11: 9:15 am - 12:00 pm - Worked on trying to update patent data through 2016
 +
 +
2017-04-06: 9:30 am - 11:30 pm - Kept looking through DTDs, kept updating documentation
 +
 +
2017-04-04: 9:00 am - 11:45 pm - Worked on updating documentation, found documentation on pulling data/making tables and databases, started looking through DTDs to find extra fields to pull
 +
 +
2017-03-23: 9:15 am - 12:00 pm - Narrowed down core tables and fields
 +
 +
2017-03-22: 5:30 pm to 6:30 pm - Patent Data meeting
 +
 +
2017-03-21: 9:30 am - 12:00 pm - Worked on determining "core" tables for new patent database
 +
 +
2017-03-09: 9:00 am - 12:00 pm Finished first draft of spreadsheet describing the current schema (and possible changes) to the Patent database
 +
 +
2017-03-07: 9:30 am - 12:00 pm Continued working on spreadsheet, added relevant page links to project page, took notes on what I want documentation to look like in the future
 +
 +
2017-03-02: 9:15 am - 12:15 pm Started excel spreadsheet to document current schema design and improvements to be made, updated project pages
 +
 +
2017-02-23: 9:30 am - 12:00 pm Reviewed Perl, read about database design, set up project page for redesigning database, started documenting process
 +
 +
2017-02-21: 9:00 am - 12:00 pm Set up work page, reviewed SQL, researched designing database, continued going through wiki
 +
 +
2017-02-16: 10:30 am - 12:00 pm Researched past work on databases, discussed project with Ed
 +
 +
2017-02-14: 10:00 am - 12:00 pm Set up personal wiki, set up work log
 +
 +
[[Category:Work Log]]

Latest revision as of 15:04, 8 December 2017

Fall 2017

Shelby Bice Work Logs (log page)

2017-12-08 1:00 pm - 2:45 pm - updated the ER Diagram on my project page to include the three tables for reissue, plant, and design patents respectively. Finished typing up the status of the project as I am leaving it with notes to Oliver and Ed

2017-12-07 3:15 PM - 4:45 PM (came in late due to finals) - finished debugging additions to Oliver's code for the tables that are related to design, reissue, and plant patents, added a troubleshooting section to Oliver's page with instructions on how to deal with issues importing the project.

2017-12-04 2:45 pm - 4:00 pm - continued debugging and started typing up troubleshooting tips for the next person who alters the patent code

2017-12-01 3:15 pm - 5:00 pm - ran code (and ran into errors) which I have been working on fixing. If I don't finish today, I'll continue doing so on Monday. I plan to write up some of the mistakes I made in adding the tables to the database and add them to Oliver's page, with his permission so that people in the future who are not familiar with the code (like I wasn't) hopefully won't fall into the same pitfalls. The main things are 1) how to set up a maven project (if IntelliJ doesn't automatically set it up for you when you open/import the project, and 2) how to set up the data source so you can run SQL scripts and actually load data into the database on the RDP.

2017-11-30-17 1:55 pm - 3:55 pm - continued altering code. Wrote creation tables script in SQL for creating tables for the design, reissue, and plant patents, and went through the checklist to make sure I had done everything to create these new tables based on Oliver's Reproducible Patent Data page. Will definitely run code tomorrow and will type up the exact process I went through to create new tables.

2017-11-17 2:15 pm - 5:00 pm - continued altering code to include the special fields for plant, reissue, and design patent. Their models and the changes to XmlParser relevant to those models should be done. I will go through the rest of the code and check where else I need to make alterations next time I am in.

2017-11-16 8:45 am - 10:30 am - continued altering code to include the special fields for plant, reissue, and design patents

2017-11-14 8:30 - 10:30 am - met with Oliver to go over his code, began working on scripts and finding paths for the fields qunie to design, reissue, and plant patents.

2017-11-10: 2:00 - 5:00 pm - updated format of worklog, finished researching fields of the new design, utility, and reissue tables, and documenting what each table contains

2017-11-03: 2:30 - 3:30 pm, 3:45 pm - 5:00 pm (I went to get a snack because I was starving!) - Finished up finding unique fields, added them to database design, and researched what the fields represented - again, this is taking a while since there is little to no documentation online about what fields on these XML files actually represent.

2017-11-02: 2:15 pm - 4:00 pm - made a main data page and continued going through the xpaths Oliver found. Notified Michelle so she can continue adding patent pages

2017-10-31: 9:00 am - 10:30 am - started trying to determine from Oliver's research what paths are unique to utility, reissue, and plant patents that we have not yet accounted for in our design of the table

2017-10-27: 2:00 pm - 3:30 pm - Kept updating tables. For some of the new values I've been adding to tables (I didn't realize we had XPaths for some fields) I'm struggling to find out exactly what the field means (for example, the date on a citation - is this the date the citedpatent was granted? or is the date that the citingpatent cited the citedpatent?) so the process is slow going. I want to get the documentation right though so in the future someone can look up and see exactly what each field in the table represents and not have to guess

2017-10-26: 2:00 pm - 4:00 pm - worked on updating the designs for the patent databases tables based on what was discussed on Friday (specifically adding inventors and lawyers tables, altering fields on patent tables) - will continue this on Friday

2017-10-20: - 2:00 pm - 5:00 pm - met with Ed and Oliver about patent database design

2017-10-19: 2:00 pm - 4:00 pm - finished up ER diagram and description of all tables for patent database, started reading papers concerning creating an inventor's database (looks like other research groups have merged the USPTO data with the Harvard Dataverse data in order to create an inventors table)

2017-10-17: 8:45 am - 10:30 am - continued trying to solve twitter issues, worked on ER diagram, skimmed through a paper I found (linked at the top of the page for Redesign Assignment and Patent Database) to see how they cleaned the data, since I assume that will be the next step to research after finishing the ER diagrams

2017-10-12: 2:30 pm - 5:00 pm write blog post on Grace Hopper Celebration and attempted to solve Twitter issue

2017-10-03: 8:45 am - 10:30 am - finished adding descriptions to the fields for each table in the patent database, started work on an ER diagram

2017-09-29: 2:00 pm - 5:00 pm - finished adding the design for the Patent database to the project page, added descriptions of the fields for each table to the project page including the datatype that I think the field will be when it's loaded into the database

2017-09-28: 9:00 am - 10:30 am - continued going over and documenting last semester's patent database design and adding the details to the Redesign Assignment and Patent Database project page. Additionally, I began trying to determine how to match up the information in the Document_Info table in Assignment to match up with a patent_id in the Patent table in Patent.

Tomorrow I will finish adding the design for the Patent database to the project page, add descriptions of the fields for each table to the project page, and start working on ER diagrams for the two databases.

Links for creating ER diagrams: https://erdplus.com/#/standalone or https://creately.com/app/?tempID=hqdgwjki1&login_type=demo#

2017-09-26: 8:45 am - 10:00 am - continued worked on design of Assignment database by checking my design against the work done last semester on the assignment data restructure to make sure I didn't miss anything major. Began going over my patent database design from last semester to tweak it. Will need to sync up with Joe Reilly to see if there are any new fields that we are pulling from the data. Additionally, I made a new project page called Redesign Assignment and Patent Database that encompasses the new design for the Assignment database and Patent database redesign and moved some of the notes from McNair/Projects/Redesigning Patent Database/New Patent Database Project/Notes on USPTO Assignment Data Paper to the project page.

The main takeaway from looking over Patent Assignment Data Restructure is that, after assembling the table according to my design (which doesn't seem to have any contradictions with the Patent Assignment Data Restructure) that there will by multiple steps for cleaning the data, specifically the fields relating to location and address in the assignment table. While the Patent Assignment Data Restructure mentions connecting to the Patent database, it is not clear from the page what field would be used to connect to the Patent database.

2017-09-23: 2:00 pm - 4:00 pm - continued working on design of Assignment database and how it will connect to Patent database by writing out what will be in each table in Assignment and questions about different possible structures of tables that we will have to address before finalizing the design - the notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper. Questions are highlighted in yellow throughout the document

2017-09-22: 8:30 am - 10:30 am - continued looking at paper on USPTO assignment data and adding to the notes on what the design of that database should look like, specifically on what I need for different tables and what I don't know yet about the design. Had to set up connection to RDP again due to technical issues.

2017-09-15: 2:00 pm - 5:00 pm - introduced to new patent database projected, reviewed and took notes on USPTO Assignment data (notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper)


Spring 2017

2017-04-27: 1:00 pm - 3:00 pm - worked on documentation more, tried to figure out how to clean citation data

2017-04-25: 10:00 am - 12:00 pm - worked on documentation, tried to determine how to clean up the USPTO Assignee Data

2017-04-20: 10:00 am - 11:30 pm - wrote copy statements for copying data from RDP to database, continued working on documentation.

2017-04-18: 9:45 am - 12:30 pm - Cleaned up documentation more, kept working through the process of parsing the data

2017-04-13: 9:30 am - 12:00 pm - Continued working on trying to update patent data through 2016, specifically parsing the data, worked with Ed to update perl scripts

2017-04-11: 9:15 am - 12:00 pm - Worked on trying to update patent data through 2016

2017-04-06: 9:30 am - 11:30 pm - Kept looking through DTDs, kept updating documentation

2017-04-04: 9:00 am - 11:45 pm - Worked on updating documentation, found documentation on pulling data/making tables and databases, started looking through DTDs to find extra fields to pull

2017-03-23: 9:15 am - 12:00 pm - Narrowed down core tables and fields

2017-03-22: 5:30 pm to 6:30 pm - Patent Data meeting

2017-03-21: 9:30 am - 12:00 pm - Worked on determining "core" tables for new patent database

2017-03-09: 9:00 am - 12:00 pm Finished first draft of spreadsheet describing the current schema (and possible changes) to the Patent database

2017-03-07: 9:30 am - 12:00 pm Continued working on spreadsheet, added relevant page links to project page, took notes on what I want documentation to look like in the future

2017-03-02: 9:15 am - 12:15 pm Started excel spreadsheet to document current schema design and improvements to be made, updated project pages

2017-02-23: 9:30 am - 12:00 pm Reviewed Perl, read about database design, set up project page for redesigning database, started documenting process

2017-02-21: 9:00 am - 12:00 pm Set up work page, reviewed SQL, researched designing database, continued going through wiki

2017-02-16: 10:30 am - 12:00 pm Researched past work on databases, discussed project with Ed

2017-02-14: 10:00 am - 12:00 pm Set up personal wiki, set up work log