Difference between revisions of "Will Cleland (Work Log)"

From edegan.com
Jump to navigation Jump to search
Line 19: Line 19:
 
* 10/13/2016 - Absent
 
* 10/13/2016 - Absent
 
* 10/14/2016 - Meet with Ed, see what needs doing
 
* 10/14/2016 - Meet with Ed, see what needs doing
 +
* 10/18/2016 - Upload options DB, determine next steps for joining DBs

Revision as of 14:17, 18 October 2016

Will Cleland Work Logs (log page)

  • 9/1/2016 - Make Wiki Pages for "Winner's Curse," familiarize self with new wiki and plan with team working on "Winner's Curse" if they are in.
  • 9/6/2016 - Work on Malmendier & Tate variables and finish wiki pages
  • 9/8/2016 - Met with Amir to go over paper and required variables for measuring CEO over confidence, familiarized myself with Ed's SQL code
  • 9/9/2016 - Talked with Jake and went over Malmendier & Tate paper to find overconfidence measures
  • 9/13/2016 - Absent
  • 9/15/2016 - Met with Amir to see which variables to use as proxys for Malmedier & Tate
  • 9/20/2016 - Work with Jake to build database (experienced technical difficulties, shout out Harsh)
  • 9/22/2016 - Develop data necessary to measure CEO overconfidence
  • 9/23/2016 - Absent
  • 9/27/2016 - Potentially upload to Stata to find which CEOs are overconfident and develop a cutoff point
  • 9/30/2016 - Pull all necessary data and put it in winnerscurse data base
  • 10/1/2016 - Came in with Jake to pull data
  • 10/4/2016 - Load data in to database
  • 10/6/2016 - Load data
  • 10/11/2016 - Worked with SDC data from Amir
  • 10/13/2016 - Absent
  • 10/14/2016 - Meet with Ed, see what needs doing
  • 10/18/2016 - Upload options DB, determine next steps for joining DBs