Difference between revisions of "Matthew Ringheanu (Work Log)"

From edegan.com
Jump to navigation Jump to search
 
(22 intermediate revisions by 2 users not shown)
Line 1: Line 1:
10/17/2016 2:00-5:00 pm: Created personal wiki page as well as work log; Read about the research project to which I have been assigned; Wrote a short summary of what I believe it is and included some helpful links
+
===Fall 2017===
 +
<onlyinclude>
  
10/18/2016 4:00-6:00 pm: Met with research partner Shrey who filled me in on where we are with the project; Began looking on websites of certain accelerators for how to determine their cohorts and listed these steps on the wiki
+
[[Matthew Ringheanu]] [[Work Logs]] [[Matthew Ringheanu (Work Log)|(log page)]]
 +
 
 +
9/11/2017 2:00-5:00 pm
 +
*Spoke to Ed about the project going forward. Organized the current updated data for our project.
 +
 
 +
9/12/2017 3:00-5:00 pm
 +
*Began going through the Cleaned Cohort Data Excel file and found a few problems with it. Will continue the cleaning process for the rest of the week.
 +
 
 +
9/13/2017 2:00-5:00 pm
 +
*Sorted through Cleaned Cohort Data and finalized our List of Accelerators. We can begin the process of creating our PercentVC table.
 +
 
 +
9/14/2017 3:00-5:00 pm
 +
*Completely finalized our dataset of accelerators and startups. Met with Michelle Passo to discuss objectives of the research for credit course.
 +
 
 +
9/18/2017 2:00-4:00 pm
 +
*Talked with Peter about the LinkedIn crawler data. Went through VC page that Meghana sent me.
 +
 
 +
9/19/2017 3:00-5:00 pm
 +
*Completed SDC pull of updated VC Data.
 +
 
 +
9/20/2017 2:00-5:00 pm
 +
*Attempted several times to run the Matcher. Cleaned our pulled data.
 +
 
 +
9/21/2017 3:00-5:00 pm
 +
*Came extremely close to running the Matcher the correctly. Reviewed the final LinkedIn data from Peter.
 +
 
 +
9/25/2017 2:00-5:00 pm
 +
*Finalized the matched file of accelerator companies with VC portfolio companies. Gave Ben the data on Georgia accelerators.
  
10/19/2016 2:00-5:00 pm: Finished looking on the remaining accelerator websites and wrote the steps on determining how to manually locate the cohorts.
+
9/26/2017 3:00-5:00 pm
 +
*Worked on finding the duplicates in our Matched file in order to have the most accurate data.
  
10/20/2016 4:00-6:00 pm: Met with Peter and Christy to discuss the possibility of creating a web crawler that will pull data from individual accelerator sites.
+
9/27/2017 2:00-5:00 pm
 +
*Attempted to find a way to organize the duplicate matches.
  
10/24/2016 2:00-5:00 pm: Brainstormed with Albert and Julia about changes to the category name for SBDE. Spoke to Ed about full scope of accelerator project.
+
9/28/2017 4:00-5:00 pm
 +
*Continued running through matched data in order to organize it effectively.
  
10/25/2016 4:00-6:00 pm: Brainstormed with Shrey about different potential industry focuses within accelerators, as well as different variables to search for in terms of accelerators, startups, cohorts, etc.
+
10/2/2017 2:00-5:00 pm
 +
*Talked to Ed about next steps for the project. Practiced accessing the crunchbase database on SQL. Brushed up on SQL code.
  
10/26/2016 2:00-5:00 pm: Began searching for more databases including lists of accelerators as well as some characteristics of those accelerators; Began searching for characteristics that identify accelerators on their websites
+
10/3/2017 3:00-5:00 pm
 +
*Searched the database for crunchbase investment information.
  
10/27/2016 4:00-6:00 pm: Continued searching for relevant lists of accelerators to include on our page. Added some links that have high potential under the tab (Obtained from List of Accelerators or various Google searches).
+
10/4/2017 2:00-5:00 pm
 +
*Pulled the funding rounds table from SQL and matched it with the companies that have received VC funding in order to gather round dates.
  
10/31/2016 2:00-5:00 pm: Began constructing a list of variables that clearly distinguish an accelerator on its website. This is in an effort to allow a crawler to crawl through many Google searches and identify accelerators.
+
10/6/2017 3:00-5:00 pm
 +
*Went through the matched data. Brainstormed ways to get the dates for cohort companies going through accelerators.
  
11/1/2016 4:00-6:00 pm: Continued looking for variables that could identify accelerators from their websites. Searched through numerous different websites of accelerators obtained from our current databases.
+
10/11/2017 2:00-3:30 pm:
 +
*Looked into using the WhoIs Parser in order to find when the companies went through their accelerators.
  
11/2/2016 2:00-4:00 pm: Continued combing through websites of numerous accelerators, well-known and other, in the hopes of finding identifying variables.
+
10/12/2017 3:00-5:00 pm
 +
*Discovered that the Wayback Machine will not be a good option for finding when companies went through their accelerators. Created a list of VCCompanies and their earliest round date. Included a column for the date they went through their accelerators and will fill it in when we find a good method of finding this date.
  
11/3/2016 4:00-6:00 pm: Finalized my list of variables that could be used to distinguish the websites of accelerators. Slightly re-arranged our list of accelerator databases in order of relevance.
+
10/16/2017 2:00-3:30 pm
 +
*Continued working on sorting VCCompanies by their earliest round date.
  
11/7/2016 2:00-5:00 pm: Began compiling the list of all accelerators. Created a new TextPad document with information from a new database.
+
10/17/2017 3:00-5:00 pm
 +
*Worked with Ben to find a solution to our problem of data acquisition. Finalized earliest round date for VCCompanies.
  
11/8/2016 4:00-6:00 pm: Worked with Shrey and Ben in order to compile all of our accelerator databases into one long list on Textpad.
+
10/18/2017 2:00-5:00 pm
 +
*Updated our VC data with Ed's help in order to increase the accuracy and completion of our data.
  
11/9/2016 2:00-5:00 pm: Continued formulating a database for all accelerators and all of the available info given.
+
10/19/2017 3:00-5:00 pm
 +
*Organized all of our matched data and updated it in order to reflect the most recent SDC pull with Ed. Matched Crunchbase data with our cohort companies.
  
11/10/2016 4:00-6:00 pm: Worked with Shrey and Peter in order to develop a crawler for f6s.
+
10/20/2017 2:00-3:30 pm
 +
*Generated the new list of VCCompanies as well as their earliest round dates.
  
11/14/2016 2:00-5:00 pm: Began sorting the Seed-DB database in an Excel document.
+
10/23/2017 2:00-3:30 pm
 +
*Worked on sorting out the discrepancies in our matched data.
  
11/15/2016 4:00-6:00 pm: Conducted some Google searches in an attempt to find more accelerator databases. Began looking through Executive Orders searching for keywords.
+
10/24/2017 3:00-5:00 pm
 +
*Went through list of VCCompanies and began adding respective accelerators in order to proceed with VCPercentage table.
  
11/16/2016 2:00-5:00 pm: Completed searching through Executive Orders.
+
10/25/2017 2:00-5:00 pm
 +
*Continued going through list of VCCompanies and adding accelerators.
  
11/17/2016 4:00-6:00 pm: Continued working on Google searches for state accelerator list. Looked through f6s for common words that can be used to distinguish accelerators once we have finalized the crawler.
+
10/26/2017 3:30-5:30 pm
 +
*Continued going through list of VCCompanies and adding accelerators. Will have this completed on Monday.
  
11/21/2016 2:00-5:00 pm: Randomly chose 10 accelerators from Excel list of accelerators on the RDP. Went through each website and listed the steps that I took in order to determine whether or not the website belonged to an accelerator. Will continue extracting cohort information tomorrow.
+
10/30/2017 2:00-3:30 pm
 +
*Finished adding all of the accelerators to the list of VCCompanies. Added a column indicating whether or not the company went through two or more accelerators.
  
11/22/2016 4:00-6:00 pm: Listed out all steps for extracting cohort information from the ten randomly chosen accelerators. Worked with Peter in order to build a tool that will search all of the HTMLs and attempt to identify each one as an accelerator as well as extract some basic information.
+
10/31/2017 3:00-5:00 pm
 +
*Began compiling data in the column for Date Company went through Accelerator.
  
11/28/2016 2:00-5:00 pm: Merged the F6S accelerator list with our other list, then posted it on the project page. Learned process for accelerator data extraction from Ed.
+
11/1/2017 2:00-4:00 pm
 +
*Finalized entering dates for Y Combinator cohort companies.
  
11/29/2016 4:00-6:00 pm: Began process of collecting data from the 20 accelerators that I am responsible for.
+
11/2/2017 4:00-5:30 pm
 +
*Continued entering cohort company dates into Excel file.
  
11/30/2016 2:00-5:00 pm: Continued collecting data from accelerators. Finished 15/20.
+
11/6/2017 2:00-4:00 pm
 +
*Continued entering cohort company dates into Excel file. Began compiling a list of keywords for demo day press releases.
  
12/1/2016 4:00-6:00 pm: Continued collecting data from accelerators. Finished original 20, picked up a new set of 20.
+
11/7/2017 3:00-5:00 pm
 +
*Finished coming up with keywords for demo day crawler. Sent the final list to Peter.
  
12/2/2016 2:00-5:00 pm: Continued collecting data from accelerators. Finished next 20.
+
11/8/2017 2:00-3:30 pm
 +
*Spoke to Ed and organized all of our current data.
  
12/8/2016 1:00-3:00 pm: Completed collecting data from accelerators for the semester.
+
11/9/2017 3:00-5:00 pm
 +
*Created a new project page called Accelerator Data and listed all relevant files as well as descriptions.
  
1/18/2017 1:00-5:00 pm: Continued collecting data for accelerator project. Helped Catherine draft tweets for the McNair Center twitter account.
+
11/14/2017 3:00-5:00 pm
 +
*Looked up URLs and decided whether or not the webiste was relevant.
  
1/20/2017 1:00-3:00 pm: Continued collecting data on accelerators. Attended McNair Center team meeting.
+
11/15/2017 2:00-5:00 pm
 +
*Created SQL database entitled "acceleratordata" and began creating tables from folder of All Relevant Files.
  
1/23/2017 1:00-5:00 pm: Began combing through accelerator list, determining which accelerators are still missing data and documenting these in a TextPad file. Finished through #115.
+
11/16/2017 3:00-5:00 pm
 +
*Continued to input tables into SQL database.
  
1/25/2017 1:00-5:00 pm: Continued looking through accelerator list.
+
11/20/2017 2:00-5:00 pm
 +
*Cleaned text files in order to import tables into SQL database.
  
1/27/2017 1:00-3:00 pm: Continued going through accelerator list. Left off on #226 with Shrey.
+
11/27/2017 2:00-5:00 pm
 +
*Worked with Peter to find and exclude irrelevant keywords on HTML pages. Began categorizing relevant demo day pages.
  
1/20/2017 1:00-5:00 pm: Continued going through accelerator list. Finished through #440.
+
11/28/2017 3:00-5:00 pm
 +
*Finished inputting tables of relevant files into SQL database.
  
2/1/2017 1:00-5:00 pm: Finished going through the list of accelerators looking for incomplete files. Began completing the files that were not done.
+
11/29/2017 2:00-5:00 pm
 +
*Went through accelerator HTML URLs. Spoke with Ed about going through HTMLs and classifying based on overall and specific relevance.
  
2/3/2017 1:00-3:00 pm: Continued working on completing accelerator files.
+
12/1/2017 3:00-5:00 pm
 +
*Worked through accelerator links and classified pages based on whether or not they provided relevant information about startup timing.
  
2/6/2017 1:00-4:30 pm: Finished data set of accelerators. Began going through and making sure that all text files and cohort files are of the same format so Peter can easily pull the information. Left for 30 minutes for an interview from 2:30-3:00 pm.
+
12/4/2017 10:00-12:00 pm
 +
*Continued running through demo day crawl URLs and scoring them based on relevance.
  
2/8/2017 1:00-5:00 pm: Finished formatting through #137. Spoke with Ed about project.
+
12/7/2017 1:00-4:30 pm
 +
*Finalized scoring of demo day URLs for the original crawl. Last day of work for this semester.
  
2/13/2017 1:00-5:00 pm: Completed formatting for all accelerator text files.
+
</onlyinclude>
  
2/15/2017 3:00-5:00 pm: Made copy of the completed data set. Spoke to Ed about future steps to take for project including gathering founder data and obtaining the crunchbase api.
+
===Spring 2017===
  
2/17/2017 1:00-3:00 pm: Went through final Excel spreadsheet for cohort information. Still need to run the crawler one more time after the completion of the editing process. Found the application for the crunchbase api which will hopefully allow us to gain access.
+
1/18/2017 1:00-5:00 pm
 +
*Continued collecting data for accelerator project. Helped Catherine draft tweets for the McNair Center twitter account.
  
2/20/2017 1:00-5:00 pm: Filled out another application for Crunchbase research access; Found the first source for the incubator project on angel.co, will hopefully work with Peter to make a crawler similar to f6s
+
1/20/2017 1:00-3:00 pm
 +
*Continued collecting data on accelerators. Attended McNair Center team meeting.
  
2/22/2017 1:00-5:00 pm: Pulled data from SDC for Ed and normalized it. Learned how to use SDC and the normalizer.
+
1/23/2017 1:00-5:00 pm
 +
*Began combing through accelerator list, determining which accelerators are still missing data and documenting these in a TextPad file. Finished through #115.
  
2/24/2017 1:00-3:00 pm: Finished cleaning up the cohort data for Y-combinator on the Final Cohort Excel Spreadsheet.
+
1/25/2017 1:00-5:00 pm
 +
*Continued looking through accelerator list.
  
2/27/2017 1:00-5:00 pm: Continued cleaning up the cohort data in the Excel file. Finished Cohort Number and Year.
+
1/27/2017 1:00-3:00 pm
 +
*Continued going through accelerator list. Left off on #226 with Shrey.
  
3/1/2017 2:00-5:00 pm: Worked with Ben and Shrey to pull data from SDC for all VC funded companies and normalized it to put it in an Excel document.
+
1/20/2017 1:00-5:00 pm
 +
*Continued going through accelerator list. Finished through #440.
  
3/3/2017 1:00-2:30 pm: Worked with Ben to try and repeat down the VC data without it going too far.
+
2/1/2017 1:00-5:00 pm
 +
*Finished going through the list of accelerators looking for incomplete files. Began completing the files that were not done.
  
3/6/2017 1:00-4:00 pm: Worked with Shrey to finish cleaning the cohort data. It is ready to be run through the matcher with Ben.
+
2/3/2017 1:00-3:00 pm
 +
*Continued working on completing accelerator files.
  
3/8/2017 1:00-5:00 pm: Matched the VC Data with the list of Cohort Companies and got one list of all cohort companies that have received VC funding.
+
2/6/2017 1:00-4:30 pm
 +
*Finished data set of accelerators. Began going through and making sure that all text files and cohort files are of the same format so Peter can easily pull the information. Left for 30 minutes for an interview from 2:30-3:00 pm.
  
3/10/2017 12:00-2:00 pm: Put a write-up on the top of the Accelerator wiki page detailing where we are in the project currently as well as what data we have accumulated on the RDP.
+
2/8/2017 1:00-5:00 pm
 +
*Finished formatting through #137. Spoke with Ed about project.
  
3/20/2017 1:00-5:00 pm: Began gathering the URLs of all accelerators in a TextPad file called Accelerator URLs. Participated in the SQL training session.
+
2/13/2017 1:00-5:00 pm
 +
*Completed formatting for all accelerator text files.
  
3/22/2017 1:00-5:00 pm: Made tables in Terminal for Accelerator companies matched with VC companies and for Cohort Data.
+
2/15/2017 3:00-5:00 pm
 +
*Made copy of the completed data set. Spoke to Ed about future steps to take for project including gathering founder data and obtaining the crunchbase api.
  
3/27/2017 1:00-4:00 pm: Compiled all URLs of accelerator into a TextPad file.
+
2/17/2017 1:00-3:00 pm
 +
*Went through final Excel spreadsheet for cohort information. Still need to run the crawler one more time after the completion of the editing process. Found the application for the crunchbase api which will hopefully allow us to gain access.
  
3/29/2017 1:00-5:00 pm: Worked on the matched data with Ben. Next time I will run the RegEx code that will filter the URLs, and I will look through the duplicates where two different VC backed company names matched to one cohort company name.
+
2/20/2017 1:00-5:00 pm
 +
*Filled out another application for Crunchbase research access; Found the first source for the incubator project on angel.co, will hopefully work with Peter to make a crawler similar to f6s
  
3/31/2017 1:00-2:00 pm: Ran the code for accelerator urls which are ready to be run through the wayback machine in order to get the start dates. Also began looking through vc backed company names.
+
2/22/2017 1:00-5:00 pm
 +
*Pulled data from SDC for Ed and normalized it. Learned how to use SDC and the normalizer.
  
4/3/2017 1:00-5:00 pm: Continued looking through double matched VC companies. Learned more SQL from Ed.
+
2/24/2017 1:00-3:00 pm
 +
*Finished cleaning up the cohort data for Y-combinator on the Final Cohort Excel Spreadsheet.
  
4/5/2017 1:00-5:00 pm: Made the final vc percentage table on terminal and for next time I will collect missing accelerator data.
+
2/27/2017 1:00-5:00 pm
 +
*Continued cleaning up the cohort data in the Excel file. Finished Cohort Number and Year.
  
4/7/2017 1:00-3:00 pm: Began collecting cohort data for big accelerators that were missing from our list in order to add it to our final list of cohort companies.
+
3/1/2017 2:00-5:00 pm
 +
*Worked with Ben and Shrey to pull data from SDC for all VC funded companies and normalized it to put it in an Excel document.
  
4/10/2017 1:00-5:00 pm: Finished gathering cohort company names for big accelerators that we were missing and put them into the Cleaned Cohort Companies Excel file. Ben is looking through Crunchbase data in order to possibly find more missing accelerators.
+
3/3/2017 1:00-2:30 pm
 +
*Worked with Ben to try and repeat down the VC data without it going too far.
  
4/14/2017 1:00-4:00 pm: Began working through "Crunchbase Potential Accelerators" textpad that may contain missing accelerators and wrote notes on the ones that I was able to go through. Need to finish this textpad before moving forward.
+
3/6/2017 1:00-4:00 pm
 +
*Worked with Shrey to finish cleaning the cohort data. It is ready to be run through the matcher with Ben.
  
4/17/2017 1:00-4:00 pm: Continued going through potential Crunchbase accelerators that we may have missed. Talked to Ed about getting a more comprehensive list from Excel file and by the end of the semester have the tables and data collected and done.
+
3/8/2017 1:00-5:00 pm
 +
*Matched the VC Data with the list of Cohort Companies and got one list of all cohort companies that have received VC funding.
  
4/19/2017 1:00-4:00 pm: Worked with Jeemin to generate an entire list of potential US accelerators from crunchbase. Worked to find a way to classify accelerators just based on their descriptions.
+
3/10/2017 12:00-2:00 pm
 +
*Put a write-up on the top of the Accelerator wiki page detailing where we are in the project currently as well as what data we have accumulated on the RDP.
  
4/21/2017: 1:00-4:00 pm: Continued working through the list identifying accelerators that we do not have. Ramee and Juliette are now helping us gather cohort data for those missing accelerators.
+
3/20/2017 1:00-5:00 pm
 +
*Began gathering the URLs of all accelerators in a TextPad file called Accelerator URLs. Participated in the SQL training session.
  
4/24/2017 9:00-1:00 pm: Updated Veeral on current state of project. Typed up a to-do list on the discussion wiki for Veeral. Got new cohort data on an accelerator and added it to Excel file.
+
3/22/2017 1:00-5:00 pm
 +
*Made tables in Terminal for Accelerator companies matched with VC companies and for Cohort Data.
  
5/3/2017 11:00-1:00 pm: Talked to Ed and Anne about future report. Continued working through list of crunchbase potential accelerators. Last day of work for this semester.
+
3/27/2017 1:00-4:00 pm
 +
*Compiled all URLs of accelerator into a TextPad file.
  
9/11/2017 2:00-5:00 pm: Spoke to Ed about the project going forward. Organized the current updated data for our project.
+
3/29/2017 1:00-5:00 pm
 +
*Worked on the matched data with Ben. Next time I will run the RegEx code that will filter the URLs, and I will look through the duplicates where two different VC backed company names matched to one cohort company name.
  
9/12/2017 3:00-5:00 pm: Began going through the Cleaned Cohort Data Excel file and found a few problems with it. Will continue the cleaning process for the rest of the week.
+
3/31/2017 1:00-2:00 pm
 +
*Ran the code for accelerator urls which are ready to be run through the wayback machine in order to get the start dates. Also began looking through vc backed company names.
  
9/13/2017 2:00-5:00 pm: Sorted through Cleaned Cohort Data and finalized our List of Accelerators. We can begin the process of creating our PercentVC table.
+
4/3/2017 1:00-5:00 pm
 +
*Continued looking through double matched VC companies. Learned more SQL from Ed.
  
9/14/2017 3:00-5:00 pm: Completely finalized our dataset of accelerators and startups. Met with Michelle Passo to discuss objectives of the research for credit course.
+
4/5/2017 1:00-5:00 pm
 +
*Made the final vc percentage table on terminal and for next time I will collect missing accelerator data.
  
9/18/2017 2:00-4:00 pm: Talked with Peter about the LinkedIn crawler data. Went through VC page that Meghana sent me.
+
4/7/2017 1:00-3:00 pm
 +
*Began collecting cohort data for big accelerators that were missing from our list in order to add it to our final list of cohort companies.
  
9/19/2017 3:00-5:00 pm: Completed SDC pull of updated VC Data.
+
4/10/2017 1:00-5:00 pm
 +
*Finished gathering cohort company names for big accelerators that we were missing and put them into the Cleaned Cohort Companies Excel file. Ben is looking through Crunchbase data in order to possibly find more missing accelerators.
  
9/20/2017 2:00-5:00 pm: Attempted several times to run the Matcher. Cleaned our pulled data.
+
4/14/2017 1:00-4:00 pm
 +
*Began working through "Crunchbase Potential Accelerators" textpad that may contain missing accelerators and wrote notes on the ones that I was able to go through. Need to finish this textpad before moving forward.
  
9/21/2017 3:00-5:00 pm: Came extremely close to running the Matcher the correctly. Reviewed the final LinkedIn data from Peter.
+
4/17/2017 1:00-4:00 pm
 +
*Continued going through potential Crunchbase accelerators that we may have missed. Talked to Ed about getting a more comprehensive list from Excel file and by the end of the semester have the tables and data collected and done.
  
9/25/2017 2:00-5:00 pm: Finalized the matched file of accelerator companies with VC portfolio companies. Gave Ben the data on Georgia accelerators.
+
4/19/2017 1:00-4:00 pm
 +
*Worked with Jeemin to generate an entire list of potential US accelerators from crunchbase. Worked to find a way to classify accelerators just based on their descriptions.
  
9/26/2017 3:00-5:00 pm: Worked on finding the duplicates in our Matched file in order to have the most accurate data.
+
4/21/2017: 1:00-4:00 pm
 +
*Continued working through the list identifying accelerators that we do not have. Ramee and Juliette are now helping us gather cohort data for those missing accelerators.
  
9/27/2017 2:00-5:00 pm: Attempted to find a way to organize the duplicate matches.
+
4/24/2017 9:00-1:00 pm
 +
*Updated Veeral on current state of project. Typed up a to-do list on the discussion wiki for Veeral. Got new cohort data on an accelerator and added it to Excel file.
  
9/28/2017 4:00-5:00 pm: Continued running through matched data in order to organize it effectively.
+
5/3/2017 11:00-1:00 pm
 +
*Talked to Ed and Anne about future report. Continued working through list of crunchbase potential accelerators. Last day of work for this semester.
  
10/2/2017 2:00-5:00 pm: Talked to Ed about next steps for the project. Practiced accessing the crunchbase database on SQL. Brushed up on SQL code.
+
===Fall 2016===
  
10/3/2017 3:00-5:00 pm: Searched the database for crunchbase investment information.
+
10/17/2016 2:00-5:00 pm
 +
*Created personal wiki page as well as work log; Read about the research project to which I have been assigned; Wrote a short summary of what I believe it is and included some helpful links
  
10/4/2017 2:00-5:00 pm: Pulled the funding rounds table from SQL and matched it with the companies that have received VC funding in order to gather round dates.
+
10/18/2016 4:00-6:00 pm
 +
*Met with research partner Shrey who filled me in on where we are with the project; Began looking on websites of certain accelerators for how to determine their cohorts and listed these steps on the wiki
  
10/6/2017 3:00-5:00 pm: Went through the matched data. Brainstormed ways to get the dates for cohort companies going through accelerators.
+
10/19/2016 2:00-5:00 pm
 +
*Finished looking on the remaining accelerator websites and wrote the steps on determining how to manually locate the cohorts.
  
10/11/2017 2:00-3:30 pm: Looked into using the WhoIs Parser in order to find when the companies went through their accelerators.
+
10/20/2016 4:00-6:00 pm
 +
*Met with Peter and Christy to discuss the possibility of creating a web crawler that will pull data from individual accelerator sites.
  
10/12/2017 3:00-5:00 pm: Discovered that the Wayback Machine will not be a good option for finding when companies went through their accelerators. Created a list of VCCompanies and their earliest round date. Included a column for the date they went through their accelerators and will fill it in when we find a good method of finding this date.
+
10/24/2016 2:00-5:00 pm
 +
*Brainstormed with Albert and Julia about changes to the category name for SBDE. Spoke to Ed about full scope of accelerator project.
  
10/16/2017 2:00-3:30 pm: Continued working on sorting VCCompanies by their earliest round date.
+
10/25/2016 4:00-6:00 pm
 +
*Brainstormed with Shrey about different potential industry focuses within accelerators, as well as different variables to search for in terms of accelerators, startups, cohorts, etc.
  
10/17/2017 3:00-5:00 pm: Worked with Ben to find a solution to our problem of data acquisition. Finalized earliest round date for VCCompanies.
+
10/26/2016 2:00-5:00 pm
 +
*Began searching for more databases including lists of accelerators as well as some characteristics of those accelerators; Began searching for characteristics that identify accelerators on their websites
  
10/18/2017 2:00-5:00 pm: Updated our VC data with Ed's help in order to increase the accuracy and completion of our data.
+
10/27/2016 4:00-6:00 pm
 +
*Continued searching for relevant lists of accelerators to include on our page. Added some links that have high potential under the tab (Obtained from List of Accelerators or various Google searches).
  
10/19/2017 3:00-5:00 pm: Organized all of our matched data and updated it in order to reflect the most recent SDC pull with Ed. Matched Crunchbase data with our cohort companies.
+
10/31/2016 2:00-5:00 pm
 +
*Began constructing a list of variables that clearly distinguish an accelerator on its website. This is in an effort to allow a crawler to crawl through many Google searches and identify accelerators.
  
10/20/2017 2:00-3:30 pm: Generated the new list of VCCompanies as well as their earliest round dates.
+
11/1/2016 4:00-6:00 pm
 +
*Continued looking for variables that could identify accelerators from their websites. Searched through numerous different websites of accelerators obtained from our current databases.
  
10/23/2017 2:00-3:30 pm: Worked on sorting out the discrepancies in our matched data.
+
11/2/2016 2:00-4:00 pm
 +
*Continued combing through websites of numerous accelerators, well-known and other, in the hopes of finding identifying variables.
  
10/24/2017 3:00-5:00 pm: Went through list of VCCompanies and began adding respective accelerators in order to proceed with VCPercentage table.
+
11/3/2016 4:00-6:00 pm
 +
*Finalized my list of variables that could be used to distinguish the websites of accelerators. Slightly re-arranged our list of accelerator databases in order of relevance.
 +
 
 +
11/7/2016 2:00-5:00 pm
 +
*Began compiling the list of all accelerators. Created a new TextPad document with information from a new database.
 +
 
 +
11/8/2016 4:00-6:00 pm
 +
*Worked with Shrey and Ben in order to compile all of our accelerator databases into one long list on Textpad.
 +
 
 +
11/9/2016 2:00-5:00 pm
 +
*Continued formulating a database for all accelerators and all of the available info given.
 +
 
 +
11/10/2016 4:00-6:00 pm
 +
*Worked with Shrey and Peter in order to develop a crawler for f6s.
 +
 
 +
11/14/2016 2:00-5:00 pm
 +
*Began sorting the Seed-DB database in an Excel document.
 +
 
 +
11/15/2016 4:00-6:00 pm
 +
*Conducted some Google searches in an attempt to find more accelerator databases. Began looking through Executive Orders searching for keywords.
 +
 
 +
11/16/2016 2:00-5:00 pm
 +
*Completed searching through Executive Orders.
 +
 
 +
11/17/2016 4:00-6:00 pm
 +
*Continued working on Google searches for state accelerator list. Looked through f6s for common words that can be used to distinguish accelerators once we have finalized the crawler.
 +
 
 +
11/21/2016 2:00-5:00 pm
 +
*Randomly chose 10 accelerators from Excel list of accelerators on the RDP. Went through each website and listed the steps that I took in order to determine whether or not the website belonged to an accelerator. Will continue extracting cohort information tomorrow.
 +
 
 +
11/22/2016 4:00-6:00 pm
 +
*Listed out all steps for extracting cohort information from the ten randomly chosen accelerators. Worked with Peter in order to build a tool that will search all of the HTMLs and attempt to identify each one as an accelerator as well as extract some basic information.
 +
 
 +
11/28/2016 2:00-5:00 pm
 +
*Merged the F6S accelerator list with our other list, then posted it on the project page. Learned process for accelerator data extraction from Ed.
 +
 
 +
11/29/2016 4:00-6:00 pm
 +
*Began process of collecting data from the 20 accelerators that I am responsible for.
 +
 
 +
11/30/2016 2:00-5:00 pm
 +
*Continued collecting data from accelerators. Finished 15/20.
 +
 
 +
12/1/2016 4:00-6:00 pm
 +
*Continued collecting data from accelerators. Finished original 20, picked up a new set of 20.
 +
 
 +
12/2/2016 2:00-5:00 pm
 +
*Continued collecting data from accelerators. Finished next 20.
 +
 
 +
12/8/2016 1:00-3:00 pm
 +
*Completed collecting data from accelerators for the semester.
  
[[Matthew Ringheanu]] [[Work Logs]] [[Matthew Ringheanu (Work Log)|(log page)]]
 
 
[[Category:Work Log]]
 
[[Category:Work Log]]

Latest revision as of 18:24, 7 December 2017

Fall 2017

Matthew Ringheanu Work Logs (log page)

9/11/2017 2:00-5:00 pm

  • Spoke to Ed about the project going forward. Organized the current updated data for our project.

9/12/2017 3:00-5:00 pm

  • Began going through the Cleaned Cohort Data Excel file and found a few problems with it. Will continue the cleaning process for the rest of the week.

9/13/2017 2:00-5:00 pm

  • Sorted through Cleaned Cohort Data and finalized our List of Accelerators. We can begin the process of creating our PercentVC table.

9/14/2017 3:00-5:00 pm

  • Completely finalized our dataset of accelerators and startups. Met with Michelle Passo to discuss objectives of the research for credit course.

9/18/2017 2:00-4:00 pm

  • Talked with Peter about the LinkedIn crawler data. Went through VC page that Meghana sent me.

9/19/2017 3:00-5:00 pm

  • Completed SDC pull of updated VC Data.

9/20/2017 2:00-5:00 pm

  • Attempted several times to run the Matcher. Cleaned our pulled data.

9/21/2017 3:00-5:00 pm

  • Came extremely close to running the Matcher the correctly. Reviewed the final LinkedIn data from Peter.

9/25/2017 2:00-5:00 pm

  • Finalized the matched file of accelerator companies with VC portfolio companies. Gave Ben the data on Georgia accelerators.

9/26/2017 3:00-5:00 pm

  • Worked on finding the duplicates in our Matched file in order to have the most accurate data.

9/27/2017 2:00-5:00 pm

  • Attempted to find a way to organize the duplicate matches.

9/28/2017 4:00-5:00 pm

  • Continued running through matched data in order to organize it effectively.

10/2/2017 2:00-5:00 pm

  • Talked to Ed about next steps for the project. Practiced accessing the crunchbase database on SQL. Brushed up on SQL code.

10/3/2017 3:00-5:00 pm

  • Searched the database for crunchbase investment information.

10/4/2017 2:00-5:00 pm

  • Pulled the funding rounds table from SQL and matched it with the companies that have received VC funding in order to gather round dates.

10/6/2017 3:00-5:00 pm

  • Went through the matched data. Brainstormed ways to get the dates for cohort companies going through accelerators.

10/11/2017 2:00-3:30 pm:

  • Looked into using the WhoIs Parser in order to find when the companies went through their accelerators.

10/12/2017 3:00-5:00 pm

  • Discovered that the Wayback Machine will not be a good option for finding when companies went through their accelerators. Created a list of VCCompanies and their earliest round date. Included a column for the date they went through their accelerators and will fill it in when we find a good method of finding this date.

10/16/2017 2:00-3:30 pm

  • Continued working on sorting VCCompanies by their earliest round date.

10/17/2017 3:00-5:00 pm

  • Worked with Ben to find a solution to our problem of data acquisition. Finalized earliest round date for VCCompanies.

10/18/2017 2:00-5:00 pm

  • Updated our VC data with Ed's help in order to increase the accuracy and completion of our data.

10/19/2017 3:00-5:00 pm

  • Organized all of our matched data and updated it in order to reflect the most recent SDC pull with Ed. Matched Crunchbase data with our cohort companies.

10/20/2017 2:00-3:30 pm

  • Generated the new list of VCCompanies as well as their earliest round dates.

10/23/2017 2:00-3:30 pm

  • Worked on sorting out the discrepancies in our matched data.

10/24/2017 3:00-5:00 pm

  • Went through list of VCCompanies and began adding respective accelerators in order to proceed with VCPercentage table.

10/25/2017 2:00-5:00 pm

  • Continued going through list of VCCompanies and adding accelerators.

10/26/2017 3:30-5:30 pm

  • Continued going through list of VCCompanies and adding accelerators. Will have this completed on Monday.

10/30/2017 2:00-3:30 pm

  • Finished adding all of the accelerators to the list of VCCompanies. Added a column indicating whether or not the company went through two or more accelerators.

10/31/2017 3:00-5:00 pm

  • Began compiling data in the column for Date Company went through Accelerator.

11/1/2017 2:00-4:00 pm

  • Finalized entering dates for Y Combinator cohort companies.

11/2/2017 4:00-5:30 pm

  • Continued entering cohort company dates into Excel file.

11/6/2017 2:00-4:00 pm

  • Continued entering cohort company dates into Excel file. Began compiling a list of keywords for demo day press releases.

11/7/2017 3:00-5:00 pm

  • Finished coming up with keywords for demo day crawler. Sent the final list to Peter.

11/8/2017 2:00-3:30 pm

  • Spoke to Ed and organized all of our current data.

11/9/2017 3:00-5:00 pm

  • Created a new project page called Accelerator Data and listed all relevant files as well as descriptions.

11/14/2017 3:00-5:00 pm

  • Looked up URLs and decided whether or not the webiste was relevant.

11/15/2017 2:00-5:00 pm

  • Created SQL database entitled "acceleratordata" and began creating tables from folder of All Relevant Files.

11/16/2017 3:00-5:00 pm

  • Continued to input tables into SQL database.

11/20/2017 2:00-5:00 pm

  • Cleaned text files in order to import tables into SQL database.

11/27/2017 2:00-5:00 pm

  • Worked with Peter to find and exclude irrelevant keywords on HTML pages. Began categorizing relevant demo day pages.

11/28/2017 3:00-5:00 pm

  • Finished inputting tables of relevant files into SQL database.

11/29/2017 2:00-5:00 pm

  • Went through accelerator HTML URLs. Spoke with Ed about going through HTMLs and classifying based on overall and specific relevance.

12/1/2017 3:00-5:00 pm

  • Worked through accelerator links and classified pages based on whether or not they provided relevant information about startup timing.

12/4/2017 10:00-12:00 pm

  • Continued running through demo day crawl URLs and scoring them based on relevance.

12/7/2017 1:00-4:30 pm

  • Finalized scoring of demo day URLs for the original crawl. Last day of work for this semester.


Spring 2017

1/18/2017 1:00-5:00 pm

  • Continued collecting data for accelerator project. Helped Catherine draft tweets for the McNair Center twitter account.

1/20/2017 1:00-3:00 pm

  • Continued collecting data on accelerators. Attended McNair Center team meeting.

1/23/2017 1:00-5:00 pm

  • Began combing through accelerator list, determining which accelerators are still missing data and documenting these in a TextPad file. Finished through #115.

1/25/2017 1:00-5:00 pm

  • Continued looking through accelerator list.

1/27/2017 1:00-3:00 pm

  • Continued going through accelerator list. Left off on #226 with Shrey.

1/20/2017 1:00-5:00 pm

  • Continued going through accelerator list. Finished through #440.

2/1/2017 1:00-5:00 pm

  • Finished going through the list of accelerators looking for incomplete files. Began completing the files that were not done.

2/3/2017 1:00-3:00 pm

  • Continued working on completing accelerator files.

2/6/2017 1:00-4:30 pm

  • Finished data set of accelerators. Began going through and making sure that all text files and cohort files are of the same format so Peter can easily pull the information. Left for 30 minutes for an interview from 2:30-3:00 pm.

2/8/2017 1:00-5:00 pm

  • Finished formatting through #137. Spoke with Ed about project.

2/13/2017 1:00-5:00 pm

  • Completed formatting for all accelerator text files.

2/15/2017 3:00-5:00 pm

  • Made copy of the completed data set. Spoke to Ed about future steps to take for project including gathering founder data and obtaining the crunchbase api.

2/17/2017 1:00-3:00 pm

  • Went through final Excel spreadsheet for cohort information. Still need to run the crawler one more time after the completion of the editing process. Found the application for the crunchbase api which will hopefully allow us to gain access.

2/20/2017 1:00-5:00 pm

  • Filled out another application for Crunchbase research access; Found the first source for the incubator project on angel.co, will hopefully work with Peter to make a crawler similar to f6s

2/22/2017 1:00-5:00 pm

  • Pulled data from SDC for Ed and normalized it. Learned how to use SDC and the normalizer.

2/24/2017 1:00-3:00 pm

  • Finished cleaning up the cohort data for Y-combinator on the Final Cohort Excel Spreadsheet.

2/27/2017 1:00-5:00 pm

  • Continued cleaning up the cohort data in the Excel file. Finished Cohort Number and Year.

3/1/2017 2:00-5:00 pm

  • Worked with Ben and Shrey to pull data from SDC for all VC funded companies and normalized it to put it in an Excel document.

3/3/2017 1:00-2:30 pm

  • Worked with Ben to try and repeat down the VC data without it going too far.

3/6/2017 1:00-4:00 pm

  • Worked with Shrey to finish cleaning the cohort data. It is ready to be run through the matcher with Ben.

3/8/2017 1:00-5:00 pm

  • Matched the VC Data with the list of Cohort Companies and got one list of all cohort companies that have received VC funding.

3/10/2017 12:00-2:00 pm

  • Put a write-up on the top of the Accelerator wiki page detailing where we are in the project currently as well as what data we have accumulated on the RDP.

3/20/2017 1:00-5:00 pm

  • Began gathering the URLs of all accelerators in a TextPad file called Accelerator URLs. Participated in the SQL training session.

3/22/2017 1:00-5:00 pm

  • Made tables in Terminal for Accelerator companies matched with VC companies and for Cohort Data.

3/27/2017 1:00-4:00 pm

  • Compiled all URLs of accelerator into a TextPad file.

3/29/2017 1:00-5:00 pm

  • Worked on the matched data with Ben. Next time I will run the RegEx code that will filter the URLs, and I will look through the duplicates where two different VC backed company names matched to one cohort company name.

3/31/2017 1:00-2:00 pm

  • Ran the code for accelerator urls which are ready to be run through the wayback machine in order to get the start dates. Also began looking through vc backed company names.

4/3/2017 1:00-5:00 pm

  • Continued looking through double matched VC companies. Learned more SQL from Ed.

4/5/2017 1:00-5:00 pm

  • Made the final vc percentage table on terminal and for next time I will collect missing accelerator data.

4/7/2017 1:00-3:00 pm

  • Began collecting cohort data for big accelerators that were missing from our list in order to add it to our final list of cohort companies.

4/10/2017 1:00-5:00 pm

  • Finished gathering cohort company names for big accelerators that we were missing and put them into the Cleaned Cohort Companies Excel file. Ben is looking through Crunchbase data in order to possibly find more missing accelerators.

4/14/2017 1:00-4:00 pm

  • Began working through "Crunchbase Potential Accelerators" textpad that may contain missing accelerators and wrote notes on the ones that I was able to go through. Need to finish this textpad before moving forward.

4/17/2017 1:00-4:00 pm

  • Continued going through potential Crunchbase accelerators that we may have missed. Talked to Ed about getting a more comprehensive list from Excel file and by the end of the semester have the tables and data collected and done.

4/19/2017 1:00-4:00 pm

  • Worked with Jeemin to generate an entire list of potential US accelerators from crunchbase. Worked to find a way to classify accelerators just based on their descriptions.

4/21/2017: 1:00-4:00 pm

  • Continued working through the list identifying accelerators that we do not have. Ramee and Juliette are now helping us gather cohort data for those missing accelerators.

4/24/2017 9:00-1:00 pm

  • Updated Veeral on current state of project. Typed up a to-do list on the discussion wiki for Veeral. Got new cohort data on an accelerator and added it to Excel file.

5/3/2017 11:00-1:00 pm

  • Talked to Ed and Anne about future report. Continued working through list of crunchbase potential accelerators. Last day of work for this semester.

Fall 2016

10/17/2016 2:00-5:00 pm

  • Created personal wiki page as well as work log; Read about the research project to which I have been assigned; Wrote a short summary of what I believe it is and included some helpful links

10/18/2016 4:00-6:00 pm

  • Met with research partner Shrey who filled me in on where we are with the project; Began looking on websites of certain accelerators for how to determine their cohorts and listed these steps on the wiki

10/19/2016 2:00-5:00 pm

  • Finished looking on the remaining accelerator websites and wrote the steps on determining how to manually locate the cohorts.

10/20/2016 4:00-6:00 pm

  • Met with Peter and Christy to discuss the possibility of creating a web crawler that will pull data from individual accelerator sites.

10/24/2016 2:00-5:00 pm

  • Brainstormed with Albert and Julia about changes to the category name for SBDE. Spoke to Ed about full scope of accelerator project.

10/25/2016 4:00-6:00 pm

  • Brainstormed with Shrey about different potential industry focuses within accelerators, as well as different variables to search for in terms of accelerators, startups, cohorts, etc.

10/26/2016 2:00-5:00 pm

  • Began searching for more databases including lists of accelerators as well as some characteristics of those accelerators; Began searching for characteristics that identify accelerators on their websites

10/27/2016 4:00-6:00 pm

  • Continued searching for relevant lists of accelerators to include on our page. Added some links that have high potential under the tab (Obtained from List of Accelerators or various Google searches).

10/31/2016 2:00-5:00 pm

  • Began constructing a list of variables that clearly distinguish an accelerator on its website. This is in an effort to allow a crawler to crawl through many Google searches and identify accelerators.

11/1/2016 4:00-6:00 pm

  • Continued looking for variables that could identify accelerators from their websites. Searched through numerous different websites of accelerators obtained from our current databases.

11/2/2016 2:00-4:00 pm

  • Continued combing through websites of numerous accelerators, well-known and other, in the hopes of finding identifying variables.

11/3/2016 4:00-6:00 pm

  • Finalized my list of variables that could be used to distinguish the websites of accelerators. Slightly re-arranged our list of accelerator databases in order of relevance.

11/7/2016 2:00-5:00 pm

  • Began compiling the list of all accelerators. Created a new TextPad document with information from a new database.

11/8/2016 4:00-6:00 pm

  • Worked with Shrey and Ben in order to compile all of our accelerator databases into one long list on Textpad.

11/9/2016 2:00-5:00 pm

  • Continued formulating a database for all accelerators and all of the available info given.

11/10/2016 4:00-6:00 pm

  • Worked with Shrey and Peter in order to develop a crawler for f6s.

11/14/2016 2:00-5:00 pm

  • Began sorting the Seed-DB database in an Excel document.

11/15/2016 4:00-6:00 pm

  • Conducted some Google searches in an attempt to find more accelerator databases. Began looking through Executive Orders searching for keywords.

11/16/2016 2:00-5:00 pm

  • Completed searching through Executive Orders.

11/17/2016 4:00-6:00 pm

  • Continued working on Google searches for state accelerator list. Looked through f6s for common words that can be used to distinguish accelerators once we have finalized the crawler.

11/21/2016 2:00-5:00 pm

  • Randomly chose 10 accelerators from Excel list of accelerators on the RDP. Went through each website and listed the steps that I took in order to determine whether or not the website belonged to an accelerator. Will continue extracting cohort information tomorrow.

11/22/2016 4:00-6:00 pm

  • Listed out all steps for extracting cohort information from the ten randomly chosen accelerators. Worked with Peter in order to build a tool that will search all of the HTMLs and attempt to identify each one as an accelerator as well as extract some basic information.

11/28/2016 2:00-5:00 pm

  • Merged the F6S accelerator list with our other list, then posted it on the project page. Learned process for accelerator data extraction from Ed.

11/29/2016 4:00-6:00 pm

  • Began process of collecting data from the 20 accelerators that I am responsible for.

11/30/2016 2:00-5:00 pm

  • Continued collecting data from accelerators. Finished 15/20.

12/1/2016 4:00-6:00 pm

  • Continued collecting data from accelerators. Finished original 20, picked up a new set of 20.

12/2/2016 2:00-5:00 pm

  • Continued collecting data from accelerators. Finished next 20.

12/8/2016 1:00-3:00 pm

  • Completed collecting data from accelerators for the semester.