Changes

Jump to navigation Jump to search
9/15/2017 2:00 pm - 5:00 pm - introduced to new patent database projected, reviewed and took notes on USPTO Assignment data (notes can be found under McNair/Projects/Redesigning Patent Database/New Patent Database Project as Notes on USPTO Assignment Data Paper)
9/22/2-17 2017 8:30 am - 10:30 am - continued looking at paper on USPTO assignment data and adding to the notes on what the design of that database should look like, specifically on what I need for different tables and what I don't know yet about the design. Had to set up connection to RDP again due to technical issues.
9/23/2017 2:00 pm - -Continued working on design of Assignment database and how it will connect to patent database by going through old notes on assignment database restructuring
[[Category:Work Log]]

Navigation menu