Changes

Jump to navigation Jump to search
no edit summary
===Fall 2017===
<onlyinclude>
[[Category:Matthew Ringheanu]] [[Work LogLogs]][[Category:InternalMatthew Ringheanu (Work Log)|(log page)]] 9/11/2017 2:00-5:00 pm*Spoke to Ed about the project going forward. Organized the current updated data for our project. 9/12/2017 3:00-5:00 pm*Began going through the Cleaned Cohort Data Excel file and found a few problems with it. Will continue the cleaning process for the rest of the week. 9/13/2017 2:00-5:00 pm*Sorted through Cleaned Cohort Data and finalized our List of Accelerators. We can begin the process of creating our PercentVC table. 9/14/2017 3:00-5:00 pm*Completely finalized our dataset of accelerators and startups. Met with Michelle Passo to discuss objectives of the research for credit course. 9/18/2017 2:00-4:00 pm*Talked with Peter about the LinkedIn crawler data. Went through VC page that Meghana sent me. 9/19/2017 3:00-5:00 pm*Completed SDC pull of updated VC Data. 9/20/2017 2:00-5:00 pm*Attempted several times to run the Matcher. Cleaned our pulled data. 9/21/2017 3:00-5:00 pm*Came extremely close to running the Matcher the correctly. Reviewed the final LinkedIn data from Peter. 9/25/2017 2:00-5:00 pm*Finalized the matched file of accelerator companies with VC portfolio companies. Gave Ben the data on Georgia accelerators. 9/26/2017 3:00-5:00 pm*Worked on finding the duplicates in our Matched file in order to have the most accurate data. 9/27/2017 2:00-5:00 pm*Attempted to find a way to organize the duplicate matches. 9/28/2017 4:00-5:00 pm*Continued running through matched data in order to organize it effectively. 10/2/2017 2:00-5:00 pm*Talked to Ed about next steps for the project. Practiced accessing the crunchbase database on SQL. Brushed up on SQL code. 10/3/2017 3:00-5:00 pm*Searched the database for crunchbase investment information. 10/4/2017 2:00-5:00 pm*Pulled the funding rounds table from SQL and matched it with the companies that have received VC funding in order to gather round dates. 10/6/2017 3:00-5:00 pm*Went through the matched data. Brainstormed ways to get the dates for cohort companies going through accelerators. 10/11/2017 2:00-3:30 pm:*Looked into using the WhoIs Parser in order to find when the companies went through their accelerators. 10/12/2017 3:00-5:00 pm*Discovered that the Wayback Machine will not be a good option for finding when companies went through their accelerators. Created a list of VCCompanies and their earliest round date. Included a column for the date they went through their accelerators and will fill it in when we find a good method of finding this date. 10/16/2017 2:00-3:30 pm*Continued working on sorting VCCompanies by their earliest round date. 10/17/2017 3:00-5:00 pm*Worked with Ben to find a solution to our problem of data acquisition. Finalized earliest round date for VCCompanies. 10/18/2017 2:00-5:00 pm*Updated our VC data with Ed's help in order to increase the accuracy and completion of our data. 10/19/2017 3:00-5:00 pm*Organized all of our matched data and updated it in order to reflect the most recent SDC pull with Ed. Matched Crunchbase data with our cohort companies. 10/20/2017 2:00-3:30 pm*Generated the new list of VCCompanies as well as their earliest round dates. 10/23/2017 2:00-3:30 pm*Worked on sorting out the discrepancies in our matched data. 10/24/2017 3:00-5:00 pm*Went through list of VCCompanies and began adding respective accelerators in order to proceed with VCPercentage table. 10/25/2017 2:00-5:00 pm*Continued going through list of VCCompanies and adding accelerators. 10/26/2017 3:30-5:30 pm*Continued going through list of VCCompanies and adding accelerators. Will have this completed on Monday. 10/30/2017 2:00-3:30 pm*Finished adding all of the accelerators to the list of VCCompanies. Added a column indicating whether or not the company went through two or more accelerators. 10/31/2017 3:00-5:00 pm*Began compiling data in the column for Date Company went through Accelerator. 11/1/2017 2:00-4:00 pm*Finalized entering dates for Y Combinator cohort companies. 11/2/2017 4:00-5:30 pm*Continued entering cohort company dates into Excel file. 11/6/2017 2:00-4:00 pm*Continued entering cohort company dates into Excel file. Began compiling a list of keywords for demo day press releases. 11/7/2017 3:00-5:00 pm*Finished coming up with keywords for demo day crawler. Sent the final list to Peter. 11/8/2017 2:00-3:30 pm*Spoke to Ed and organized all of our current data. 11/9/2017 3:00-5:00 pm*Created a new project page called Accelerator Data and listed all relevant files as well as descriptions. 11/14/2017 3:00-5:00 pm*Looked up URLs and decided whether or not the webiste was relevant. 11/15/2017 2:00-5:00 pm*Created SQL database entitled "acceleratordata" and began creating tables from folder of All Relevant Files. 11/16/2017 3:00-5:00 pm*Continued to input tables into SQL database. 11/20/2017 2:00-5:00 pm*Cleaned text files in order to import tables into SQL database. 11/27/2017 2:00-5:00 pm*Worked with Peter to find and exclude irrelevant keywords on HTML pages. Began categorizing relevant demo day pages. 11/28/2017 3:00-5:00 pm*Finished inputting tables of relevant files into SQL database. 11/29/2017 2:00-5:00 pm*Went through accelerator HTML URLs. Spoke with Ed about going through HTMLs and classifying based on overall and specific relevance. 12/1/2017 3:00-5:00 pm*Worked through accelerator links and classified pages based on whether or not they provided relevant information about startup timing. 12/4/2017 10:00-12:00 pm*Continued running through demo day crawl URLs and scoring them based on relevance. 12/7/2017 1:00-4:30 pm*Finalized scoring of demo day URLs for the original crawl. Last day of work for this semester. </onlyinclude> ===Spring 2017=== 1/18/2017 1:00-5:00 pm*Continued collecting data for accelerator project. Helped Catherine draft tweets for the McNair Center twitter account. 1/20/2017 1:00-3:00 pm*Continued collecting data on accelerators. Attended McNair Center team meeting. 1/23/2017 1:00-5:00 pm*Began combing through accelerator list, determining which accelerators are still missing data and documenting these in a TextPad file. Finished through #115. 1/25/2017 1:00-5:00 pm*Continued looking through accelerator list. 1/27/2017 1:00-3:00 pm*Continued going through accelerator list. Left off on #226 with Shrey. 1/20/2017 1:00-5:00 pm*Continued going through accelerator list. Finished through #440. 2/1/2017 1:00-5:00 pm*Finished going through the list of accelerators looking for incomplete files. Began completing the files that were not done. 2/3/2017 1:00-3:00 pm*Continued working on completing accelerator files. 2/6/2017 1:00-4:30 pm*Finished data set of accelerators. Began going through and making sure that all text files and cohort files are of the same format so Peter can easily pull the information. Left for 30 minutes for an interview from 2:30-3:00 pm. 2/8/2017 1:00-5:00 pm*Finished formatting through #137. Spoke with Ed about project. 2/13/2017 1:00-5:00 pm*Completed formatting for all accelerator text files. 2/15/2017 3:00-5:00 pm*Made copy of the completed data set. Spoke to Ed about future steps to take for project including gathering founder data and obtaining the crunchbase api. 2/17/2017 1:00-3:00 pm*Went through final Excel spreadsheet for cohort information. Still need to run the crawler one more time after the completion of the editing process. Found the application for the crunchbase api which will hopefully allow us to gain access. 2/20/2017 1:00-5:00 pm*Filled out another application for Crunchbase research access; Found the first source for the incubator project on angel.co, will hopefully work with Peter to make a crawler similar to f6s 2/22/2017 1:00-5:00 pm*Pulled data from SDC for Ed and normalized it. Learned how to use SDC and the normalizer. 2/24/2017 1:00-3:00 pm*Finished cleaning up the cohort data for Y-combinator on the Final Cohort Excel Spreadsheet. 2/27/2017 1:00-5:00 pm*Continued cleaning up the cohort data in the Excel file. Finished Cohort Number and Year. 3/1/2017 2:00-5:00 pm*Worked with Ben and Shrey to pull data from SDC for all VC funded companies and normalized it to put it in an Excel document. 3/3/2017 1:00-2:30 pm*Worked with Ben to try and repeat down the VC data without it going too far. 3/6/2017 1:00-4:00 pm*Worked with Shrey to finish cleaning the cohort data. It is ready to be run through the matcher with Ben. 3/8/2017 1:00-5:00 pm*Matched the VC Data with the list of Cohort Companies and got one list of all cohort companies that have received VC funding. 3/10/2017 12:00-2:00 pm*Put a write-up on the top of the Accelerator wiki page detailing where we are in the project currently as well as what data we have accumulated on the RDP.
103/1720/2016 22017 1:00-5:00 pm: Created personal wiki page as well as work log; Read about *Began gathering the research project to which I have been assigned; Wrote URLs of all accelerators in a short summary of what I believe it is and included some helpful linksTextPad file called Accelerator URLs. Participated in the SQL training session.
103/1822/2016 42017 1:00-65:00 pm: Met with research partner Shrey who filled me *Made tables in on where we are Terminal for Accelerator companies matched with the project; Began looking on websites of certain accelerators VC companies and for how to determine their cohorts and listed these steps on the wikiCohort Data.
103/1927/2016 22017 1:00-54:00 pm: Finished looking on the remaining *Compiled all URLs of accelerator websites and wrote the steps on determining how to manually locate the cohortsinto a TextPad file.
103/2029/2016 42017 1:00-65:00 pm: Met *Worked on the matched data with Peter and Christy to discuss Ben. Next time I will run the possibility of creating a web crawler RegEx code that will pull data from individual accelerator sitesfilter the URLs, and I will look through the duplicates where two different VC backed company names matched to one cohort company name.
103/2431/2016 22017 1:00-52:00 pm: Brainstormed with Albert and Julia about changes *Ran the code for accelerator urls which are ready to be run through the wayback machine in order to get the category name for SBDEstart dates. Spoke to Ed about full scope of accelerator projectAlso began looking through vc backed company names.
104/253/2016 42017 1:00-65:00 pm: Brainstormed with Shrey about different potential industry focuses within accelerators, as well as different variables to search for in terms of accelerators, startups, cohorts, etc*Continued looking through double matched VC companies. Learned more SQL from Ed.
104/265/2016 22017 1:00-5:00 pm: Began searching *Made the final vc percentage table on terminal and for more databases including lists of accelerators as well as some characteristics of those accelerators; Began searching for characteristics that identify accelerators on their websitesnext time I will collect missing accelerator data.
104/277/2016 42017 1:00-63:00 pm: Continued searching *Began collecting cohort data for relevant lists of big accelerators that were missing from our list in order to add it to include on our page. Added some links that have high potential under the tab (Obtained from List final list of Accelerators or various Google searches)cohort companies.
4/10/31/2016 22017 1:00-5:00 pm: Began constructing a list of variables *Finished gathering cohort company names for big accelerators that clearly distinguish an accelerator on its websitewe were missing and put them into the Cleaned Cohort Companies Excel file. This Ben is looking through Crunchbase data in an effort to allow a crawler order to crawl through many Google searches and identify possibly find more missing accelerators.
114/14/2017 1/2016 4:00-64:00 pm: Continued looking for variables *Began working through "Crunchbase Potential Accelerators" textpad that could identify may contain missing accelerators from their websitesand wrote notes on the ones that I was able to go through. Searched through numerous different websites of accelerators obtained from our current databasesNeed to finish this textpad before moving forward.
114/217/2016 22017 1:00-4:00 pm: *Continued combing going through websites of numerous potential Crunchbase accelerators, well-known that we may have missed. Talked to Ed about getting a more comprehensive list from Excel file and other, in by the hopes end of finding identifying variablesthe semester have the tables and data collected and done.
114/319/2016 42017 1:00-64:00 pm: Finalized my *Worked with Jeemin to generate an entire list of variables that could be used potential US accelerators from crunchbase. Worked to find a way to distinguish the websites of classify accelerators. Slightly re-arranged our list of accelerator databases in order of relevancejust based on their descriptions.
114/721/2016 22017: 1:00-54:00 pm: Began compiling *Continued working through the list of all identifying acceleratorsthat we do not have. Created a new TextPad document with information from a new databaseRamee and Juliette are now helping us gather cohort data for those missing accelerators.
114/824/2016 42017 9:00-61:00 pm: Worked with Shrey and Ben in order *Updated Veeral on current state of project. Typed up a to compile all of our accelerator databases into one long -do list on Textpadthe discussion wiki for Veeral. Got new cohort data on an accelerator and added it to Excel file.
115/93/2016 22017 11:00-51:00 pm: *Talked to Ed and Anne about future report. Continued formulating a database for all working through list of crunchbase potential accelerators and all . Last day of the available info givenwork for this semester.
11/10/===Fall 2016 4:00-6:00 pm: Worked with Shrey and Peter in order to develop a crawler for f6s.===
1110/1417/2016 2:00-5:00 pm: Began sorting *Created personal wiki page as well as work log; Read about the Seed-DB database in an Excel document.research project to which I have been assigned; Wrote a short summary of what I believe it is and included some helpful links
1110/1518/2016 4:00-6:00 pm: Conducted some Google searches *Met with research partner Shrey who filled me in an attempt to find more accelerator databases. on where we are with the project; Began looking through Executive Orders searching on websites of certain accelerators for keywords.how to determine their cohorts and listed these steps on the wiki
1110/1619/2016 2:00-5:00 pm: Completed searching through Executive Orders*Finished looking on the remaining accelerator websites and wrote the steps on determining how to manually locate the cohorts.
1110/1720/2016 4:00-6:00 pm: Continued working on Google searches for state accelerator list. Looked through f6s for common words that can be used *Met with Peter and Christy to distinguish accelerators once we have finalized discuss the possibility of creating a web crawlerthat will pull data from individual accelerator sites.
1110/2124/2016 2:00-5:00 pm: Randomly chose 10 accelerators from Excel list of accelerators on the RDP. Went through each website *Brainstormed with Albert and listed the steps that I took in order Julia about changes to determine whether or not the website belonged category name for SBDE. Spoke to an Ed about full scope of accelerator. Will continue extracting cohort information tomorrowproject.
1110/2225/2016 4:00-6:00 pm: Listed out all steps for extracting cohort information from the ten randomly chosen *Brainstormed with Shrey about different potential industry focuses within accelerators. Worked with Peter in order , as well as different variables to build a tool that will search all for in terms of the HTMLs and attempt to identify each one as an accelerator as well as extract some basic informationaccelerators, startups, cohorts, etc.
1110/2826/2016 2:00-5:00 pm: Merged the F6S accelerator list with our other list, then posted it *Began searching for more databases including lists of accelerators as well as some characteristics of those accelerators; Began searching for characteristics that identify accelerators on the project page. Learned process for accelerator data extraction from Ed.their websites
1110/2927/2016 4:00-6:00 pm: Began process *Continued searching for relevant lists of collecting data from the 20 accelerators to include on our page. Added some links that I am responsible forhave high potential under the tab (Obtained from List of Accelerators or various Google searches).
1110/3031/2016 2:00-5:00 pm: Continued collecting data from *Began constructing a list of variables that clearly distinguish an accelerator on its website. This is in an effort to allow a crawler to crawl through many Google searches and identify accelerators. Finished 15/20.
1211/1/2016 4:00-6:00 pm: *Continued collecting data looking for variables that could identify accelerators from acceleratorstheir websites. Finished original 20, picked up a new set Searched through numerous different websites of 20accelerators obtained from our current databases.
1211/2/2016 2:00-54:00 pm: *Continued collecting data from combing through websites of numerous accelerators. Finished next 20, well-known and other, in the hopes of finding identifying variables.
1211/83/2016 14:00-36:00 pm: Completed collecting data from *Finalized my list of variables that could be used to distinguish the websites of accelerators for the semester. Slightly re-arranged our list of accelerator databases in order of relevance.
111/187/2017 12016 2:00-5:00 pm: Continued collecting data for accelerator project*Began compiling the list of all accelerators. Helped Catherine draft tweets for the McNair Center twitter accountCreated a new TextPad document with information from a new database.
111/208/2017 12016 4:00-36:00 pm: Continued collecting data *Worked with Shrey and Ben in order to compile all of our accelerator databases into one long list on accelerators. Attended McNair Center team meetingTextpad.
111/239/2017 12016 2:00-5:00 pm: Began combing through accelerator list, determining which *Continued formulating a database for all accelerators are still missing data and documenting these in a TextPad file. Finished through #115all of the available info given.
111/2510/2017 12016 4:00-56:00 pm: Continued looking through accelerator list*Worked with Shrey and Peter in order to develop a crawler for f6s.
111/2714/2017 12016 2:00-35:00 pm: Continued going through accelerator list. Left off on #226 with Shrey*Began sorting the Seed-DB database in an Excel document.
111/2015/2017 12016 4:00-56:00 pm: Continued going through *Conducted some Google searches in an attempt to find more accelerator listdatabases. Finished Began looking through #440Executive Orders searching for keywords.
211/116/2017 12016 2:00-5:00 pm: Finished going *Completed searching through the list of accelerators looking for incomplete files. Began completing the files that were not doneExecutive Orders.
211/317/2017 12016 4:00-36:00 pm: *Continued working on completing Google searches for state accelerator fileslist. Looked through f6s for common words that can be used to distinguish accelerators once we have finalized the crawler.
211/621/2017 12016 2:00-45:30 00 pm: Finished data set *Randomly chose 10 accelerators from Excel list of acceleratorson the RDP. Began going Went through each website and making sure listed the steps that all text files and I took in order to determine whether or not the website belonged to an accelerator. Will continue extracting cohort files are of the same format so Peter can easily pull the information. Left for 30 minutes for an interview from 2:30-3:00 pmtomorrow.
211/822/2017 12016 4:00-56:00 pm: Finished formatting through #137*Listed out all steps for extracting cohort information from the ten randomly chosen accelerators. Spoke Worked with Ed about projectPeter in order to build a tool that will search all of the HTMLs and attempt to identify each one as an accelerator as well as extract some basic information.
211/1328/2017 12016 2:00-5:00 pm: Completed formatting *Merged the F6S accelerator list with our other list, then posted it on the project page. Learned process for all accelerator text filesdata extraction from Ed.
211/1529/2017 32016 4:00-56:00 pm: Made copy *Began process of collecting data from the completed data set. Spoke to Ed about future steps to take 20 accelerators that I am responsible for project including gathering founder data and obtaining the crunchbase api.
211/1730/2017 12016 2:00-35:00 pm: Went through final Excel spreadsheet for cohort information*Continued collecting data from accelerators. Still need to run the crawler one more time after the completion of the editing process. Found the application for the crunchbase api which will hopefully allow us to gain accessFinished 15/20.
212/201/2017 12016 4:00-56:00 pm: Filled out another application for Crunchbase research access; Found the first source for the incubator project on angel*Continued collecting data from accelerators.coFinished original 20, will hopefully work with Peter to make picked up a crawler similar to f6snew set of 20.
12/2/22/2017 12016 2:00-5:00 pm: Pulled *Continued collecting data from SDC for Ed and normalized itaccelerators. Learned how to use SDC and the normalizerFinished next 20.
212/248/2017 2016 1:00-3:00 pm: Finished cleaning up the cohort *Completed collecting data from accelerators for Y-combinator on the Final Cohort Excel Spreadsheetsemester.
[[Matthew Ringheanu]] [[Work Logs]] [[Matthew Ringheanu (Category:Work Log)|(log page)]]

Navigation menu