Changes

Jump to navigation Jump to search
[[Joe Reilly]] [[Work Logs]] [[Joe Reilly (Work Log)|(log page)]]
 
2017-3-26: Added Score column to Accelerator Master Variable List google Doc; began filling in necessary info.
 
2017-3-19: Filled in part of 'duration' column on Accelerator Master List Doc.
 
2017-3-9: Created a google doc of the Accelerator master list
2017-3-5: Created "Potential Other "Variables full list" in E:\McNair\Projects\Accelerators\Spring 2018\Grouping project of ListOfAccs. Began comprehensive list of all possible variables that could be included using current info in Master Accelerator Variable Master List Project Excel File.
447

edits

Navigation menu