Changes

Jump to navigation Jump to search
[[Joe Reilly]] [[Work Logs]] [[Joe Reilly (Work Log)|(log page)]]
 
2017-3-26: Added Score column to Accelerator Master Variable List google Doc; began filling in necessary info.
 
2017-3-19: Filled in part of 'duration' column on Accelerator Master List Doc.
 
2017-3-9: Created a google doc of the Accelerator master list
 
2017-3-5: Created "Potential Other "Variables full list" in E:\McNair\Projects\Accelerators\Spring 2018\Grouping project of ListOfAccs. Began comprehensive list of all possible variables that could be included using current info in Master Accelerator Variable Master List Project Excel File.
2017-3-2: Fixed errors on Master Accelerator Variable Master List Project in E:\McNair\Projects\Accelerators\Spring 2018; created "Potential Other Variables" in E:\McNair\Projects\Accelerators\Spring 2018\Grouping project of ListOfAccs.
447

edits

Navigation menu