Changes

Jump to navigation Jump to search
no edit summary
{{McNair ProjectsProject|Has project output=Data|Project TitleHas title=Accelerator Industry Classification (Data),|Topic Area=Entrepreneurship Ecosystems,|OwnerHas owner=Veeral Shah,|Start TermHas start date=Summer 2016,|KeywordsHas keywords=Mechanical Turk,Tool|Has sponsor=McNair Center|Has notes=|Is dependent on=|Primary BillingDepends upon it=AccNBER01,|Has project status=Tabled
}}
 
This page is included in the project [[Accelerators (Data)]]
 
Accelerators classified by the industry of which the accelerators' cohorts typically reside in.
'''Step 1: Retrieve URLs for each of the companies''' For the first task, we will get the URLs for the company websites of every company that entered an accelerator. To do so, we will use “Porfolio Firms” Tab of the Google Sheet called “Accelerator-Portfolio-NAICS”.  The link to the google sheet is here: https://docs.google.com/spreadsheets/d/1Bw3qX7xLs5lSv577pS9YUtURDofYdqOza2MuP4dbthw/edit?usp=sharing
For the first task, we will get the URLs for the company websites of every company that entered an accelerator. To do so, we will use “Porfolio Firms” Tab of the Excel Sheet called “Accelerator-Portfolio-NAICS”. Here are the steps, each refers step refers to this sheet explicitely:
1. Look for a row that does not have the URL column filled out
 
2. Check to make sure that no one else is working on that row by seeing if someone has placed their cursor on that row
 
3. Now put your cursor on that row by clicking on the row’s Name column (this will make sure no one duplicates your work)
 
4. Now copy the Accelerator and Name columns of that row
 
5. Paste them into the google search box and search
 
6. Find a website that references both the accelerator name and the startup name
 
7. Click on that website’s link in google
 
8. See if the webpage includes a URL for the startup
 
9. Copy the company’s URL to the URL column in the row of the startup in the “Accelerator-Portfolio-NAICS” sheet
 
10. Put your initials (first, middle and last) in the “URL-ENTERER” column of the spreadsheet
 
11. If you have time, go back to step 1 and repeat
'''Step 2: Measure your productivity at Step 1''' 1. Repeat Step 1 for 1.5 - 2 hours while keeping track of how many rows you have completed (I do it by noting start and end row throughout this period). For this period of work, really try to focus and see how well you can do. We are trying to establish a top end of the productivity possible when running this task in this way. 2. Make note of your production for that time period both overall and in terms of per minute completion rate in the lab notes section below. 3. In addition to the simple fact of how fast you were able to complete rows of data, please make notes of what took the most amount of time on average for each step. Essentially, I want you to do a rough version of a "time motion" study (feel free to look that up) that will reveal potential sources of productivity gain if we could automate them. '''Step 3: Install a new piece of software into the server system''' 1. Find time with Ed to install the software provided at the links below onto the system https://www.dropbox.com/s/egau7yuho3wkjlo/gscript.py?dl=0 https://www.dropbox.com/s/afqzcpsxvvl1k2n/glink.py?dl=0 1a. While you wait for Ed to help you with the installation, I want you to read through the code in these two programs. I want you to really puzzle through how this all works until you think you understand it. As you do this, I want you to keep good notes on the wiki (including potentially screenshots) under the lab notebook tab. Also, I want you to freely message me with questions as you go. '''Step 4: Run the new software on a limited batch of the spreadsheet above''' 1. Call me before you do this, but this step should be self explanatory 2. The program will output the same sheet you inputted but with appended search results. This should make it simpler to find a URL for the website 3. Create a set of steps that use the output of the program to find company URLS and note those steps in your lab notes =Energy/Environmental=Lab Notes==6/21/2016 - 11:00 AM - 12:30 PM Formed Productivity Baseline - 130 Rows completed in 90 minutes, slightly under 1.5 rows per minutes at full productivity.
==Women==
==International==
 
<!-- flush flush -->
 
[[Category: Affiliate Cohen]]<!-- flush -->

Navigation menu